Archive | October, 2009

NT not to invest in Upper Tamakoshi unless it gets share

Posted on 26 October 2009 by editor

Nepal Telecom (NT) has backtracked from its earlier decision to invest Rs 6 billion in loan for the construction of Upper Tamakoshi hydro-electric project, Nagarik daily reported. NTC backtracked from its decision after Minister for Information and Communications Shankar Pokhrel directed it not to invest in the project unless equity share worth the amount is given [...]

Details

Comments (0)

Tags: , , , , , , , , , , , , , , , ,

WB sheds light on power woes

Posted on 26 October 2009 by editor

KATHMANDU: It takes 73 days to fulfil six procedures to get an electricity connection in Nepal, according to a World Bank pilot project. The same can be done in 22 days and four procedures in Iceland but takes 424 days in Afghanistan. Getting Electricity — the two-and-a-half-year project — presents findings on the constraints entrepreneurs around [...]

Details

Comments (0)

Tags: , , , , , , , , , , ,

Power cut to stay for 3 yrs: Minister

Posted on 26 October 2009 by editor

BIRGUNJ: Minister for Energy Prakash Sharan Mahat said today that the country would face power-cuts for at least three more years. Speaking at a press conference organised by Nepal Press Union Parsa, he said, “The dark hours will stay here as high capacity transmission line for electricity from India to Nepal won’t be in place before [...]

Details

Comments (0)

Tags: , , , , , , ,

Power generated by Pani-ghatta in Pashupatinagar

Posted on 26 October 2009 by editor

Pashupatinagar, Oct 22 :Electricity in the remote Yaktapa village has been generated with the use of improved water spin, popularly known as pani ghatta. It is the first time in the whole eastern region that pani-ghatta has been used to generate water-mill power. The active involvement of the residents of Yaktapa and Phakaphok has been able [...]

Details

Comments (0)

ADB Mission in West Seti

Posted on 08 October 2009 by editor

Video Courtesy : Dipesh Vikram Shahi, Dhangadhi

Details

Comments (0)

Taiwanese Village Blames Water Project for Typhoon Disaster

Posted on 08 October 2009 by editor

Water project in Taiwan is causing widespread discontent in a local community affected by this month’s Typhoon Morakot. The angry residents of the southern village of Hsiaolin say that a massive government project that diverts water from a river to a local dam has aggravated the already devastating mudslides that have recently killed hundreds of people [...]

Details

Comments (0)

Tags: , , , ,

No alternative to power purchase from India : Mahat

Posted on 08 October 2009 by editor

The meeting of the Joint Commission on Water Resources is scheduled for the first week of November and is to be followed soon after by ministerial-level talks that will take up all issues relating to the setting up of the Pancheshwar Development Authority and reach a conclusion. We have informally agreed to locate PDA headquarters in Nepal

Details

Comments (0)

The megawatt farce

Posted on 08 October 2009 by editor

By Peeyush Tiwari

I would like to quote John F. Kennedy who said, “One who solves the problem of water is worth two Nobel prizes; one for peace and one for science.” It’s been over three decades since Kennedy expressed his view over the gravity of the problem related to water. However, it seems that our leaders still consider it child’s play. The problems related to water are multidimensional —economic, social and political. Even the immediate cause of World War II was related to water —the issue of access to the Polish Shipping Corridor

Details

Comments (0)

पहिरोले थप १७ को मृत्यु

Posted on 08 October 2009 by editor

सोमबारदेखिको अविरल बर्षाका कारण पहिरोमा परेर बुधबार १७ जनाको मृत्यु भएको छ। बाढीपहिरोमा परेर दाङ, रुकुम, अछाम र बर्दियामा ९ जना बेपत्ता छन् भने सयौं सर्वसाधारण विस्थापित भएका छन्। यो सँगै पहिरोमा मृत्यु हुनेको संख्या अछाममा २०, बझाङमा ७, डोटीमा २, डडेल्धुरामा १२, बैतडीमा १ सहित ४२ पुगेको छ। पश्चिम, मध्यपश्चिम र सुदूरपश्चिमका अधिकांश क्षेत्रमा यातायात [...]

Details

Comments (0)

तामाकोसीलाई ६ अर्ब दिन टेलिकम तयार

Posted on 08 October 2009 by editor

काठमाडौ, २०६६ आश्विन २२ - वित्तीय व्यवस्थापन हुन नसकेका कारण निर्माणमा ढिलाइ भइरहेको बहुचर्चित माथिल्लो तामाकोसी -४५६ मेगावाट) मा नेपाल टेलिकमले ६ अर्ब रुपैयाँ ऋण लगानी गर्ने भएको छ । टेलिकमले ऋण सम्झौता गरेपछि माथिल्लो तामाकोसीका लागि आवश्यक लगानी पूरा हुनेछ । विद्युत प्राधिकरण र टेलिकमद्वारा गठित उच्चस्तरीय वार्ता कमिटीले बुधबार माथिल्लो तामाकोसीमा लगानी गर्न सिफारिस [...]

Details

Comments (0)

Photo Feature

Guest Column

    Mahakali Treaty outcome of economic nationalism

    By Hari Bansh Jha

     It was on 12 February 1996 that the the Nepalese Prime Minister Sher Bahadur Deuba and the then Indian Prime Minister P.V. Narsimha Rao signed an agreement on the integrated development of the Mahakali river in Delhi. The Pancheshwor Project under the Treaty was expected to produce 6,000 MW of hydro-power with the investment cost [...]

    Details

Interview

    No alternative to power purchase from India : Mahat

    The meeting of the Joint Commission on Water Resources is scheduled for the first week of November and is to be followed soon after by ministerial-level talks that will take up all issues relating to the setting up of the Pancheshwar Development Authority and reach a conclusion. We have informally agreed to locate PDA headquarters in Nepal

    Details

Opinoin Tank

    Pain of Losing West Seti

    By Sudheer Raj Sharma Dhakal

    The well-versed 750 MW West Seti Hydroelectric Project (WSHP) is once again capturing major energy headlines in both the print and electronic media of Nepal. Looked as a porthole for the development of the Far Western Development Region (FWDR) that has received the least development privilege, this project has been lingering for more than a [...]

    Details

Polls

  • चीन र नेपालकका यूवाहरु एक अर्काका देशमा भ्रमण गर्न पाउने सम्झौता तपाईलाई कस्तो लाग्यो ?

    View Results

    Loading ... Loading ...
Polls Archive